In the mid nineteenth century, there were many proposals to construct new railwaysSome of these were overly ambitious and never saw the light of day, others were superceded by revised schemes. In this thread I will outline some of those planned railways as announced in the regional newspapers.

 

In November 1845, The Sheffield, Ashton-Under-Lyne and Manchester Railway was seeking Parliamentary powers to construct a railway from Dukinfield to Bradshaw Edge, Whaley Bridge or at some intermediate point. A branch from New Mills to Hayfield was also proposed.

In December 1846, special trains from Manchester and Sheffeild carried directors and shareholders of the Sheffield and Manchester Railway to the Dog Lane Station at Dukinfirled.  The occassion was the ceremony of cutting the first sod of the new Whaley Bridge branch. Having arrived at Dukinfield, the guests had to walk about a mile along the tracks to Flowery Field where the event was to take place. A polished steel spade was provided and carried various inscriptions including the arms of the company and the names of the directors. The shaft was adorned with a profile of the Queen.  The spade was presented by the Chairman, Mr John Chapman, to F.D.Astley Esq who then cut a large sod which he then wheeled away. Returning he called for three times three cheers for the Whaley Bridge Branch. After each of the directors had cut a sod, it was the turn of the navvies who had soon made a pretty large opening.  The company then returned by train to Manchester where they were entertained to dinner at the Albion Hotel.

In August 1947 it was reported that 80,000 cubic yards of earthworks had been raised, five bridges had been built and four others in hand. The foundations for the viaduct at Marple were about to be commenced. Much of the route from Dukinfiedl to Hyde was ready for ballasting. Possession of the land between Marple and Whaley Bridge had not yet been obtained but the whole of the line had been staked out.

The company had spent some £85,000 on the line and it had been completed as far as Hyde. When the company wanted rails for use elsewhere, they found the price to be too high and did no think it expedient to buy them at that time. They therefore lifted them from the Whaley Bridge branch.

In February 1849, thye company announced that works on the Whaley Bridge branch had been entirely suspended.

In 1854, at a meeting of the Manchester, Sheffield and Lincolnshire Company, it was stated that the North Western Company was supporting the proposed line from Stockport to Disley and Whgaley Bridge and this was considered an unfriendly gesture. The company already had parliamentary powers to build their own line from Newton near Hyde, to Whaley Bridge and had already purchased land for the purpose.  it was now proposed to seek powers to complete the railway in opposition to that now proposed. They also considered it advantageous to build a line from Woodley to Stockport and branches to Hayfield and Bugsworth.


The railways linking Hyde, Marple, New Mills and Hayfield were of course subsequently completed. There is still visible evidence, near to the site of Gow Hole sidings, of the earthworks which would have taken the line towards Whaley. Construction of the Midland line throught the valley took over much of those workings.

parabuild  
#2 Posted : 13 June 2011 22:11:05(UTC)
parabuild
Rank: Advanced Member

Groups: Member
Joined: 10/07/2009(UTC)
Posts: 794
Man
Location: furness vale

Thanks: 3 times

Another proposal in November 1845 sought to link Sheffield with Macclesfield.  The line was to commence close to the Sheffield Station of the Sheffield, Ashton-under-lyne and Manchester Railway and terminate in or near the town of Macclesfield either at it's own station or by forming a junction with the Manchester and Birmingham Railway.  
The precise route was not given in the newspaper report although it appeared to pass through the Hope Valley and Whaley Bridge.
Application was about to be made to Parliament for the necessary powers.

It would be interesting to know how they intended to engineer this line through the hills between Macclesfield and Whaley.

 

 

 

 

 

 

 


davethescope  
#3 Posted : 14 June 2011 10:39:54(UTC)
davethescope
Rank: Advanced Member

Groups: Member
Joined: 15/06/2009(UTC)
Posts: 475
Man
United Kingdom
Location: Whaley Bridge

Thanks: 1 times
Was thanked: 21 time(s) in 17 post(s)

It would be interesting to know how they intended to engineer this line through the hills between Macclesfield and Whaley.




Follow the NorthWestern route to Disley. Then through or round Lyme park to Bollington and connect with the London line around Prestbury.

That is my favoured cycling route to Macc since it is not too hilly

The optimist believes that Whaley Bridge is the best place in the world to live. The pessimist fears he might be correct.
parabuild  
#4 Posted : 16 June 2011 22:47:05(UTC)
parabuild
Rank: Advanced Member

Groups: Member
Joined: 10/07/2009(UTC)
Posts: 794
Man
Location: furness vale

Thanks: 3 times

These railway proposals are according to announcements by the promotors in the newspapers of the time. In only a  few cases were the routes described in detail although these were usually available elsewhere.  Davethescope's route from Disley sounds feasible although it was stated that the line would terminate in Macclesfield Town.  A later proposal for a line between Macclesfield and Whaley was of a route length of 8 miles and this would sound like a direct line.

I have been given some other information about proposed routing.  It seems that Cowburn tunnel had been suggested as early as 1815, originally for a canal route between Bugsworth and Cromford via the Derwent Valley.  This same route would have been followed by some of the abortive railway schemes.

parabuild  
#5 Posted : 01 July 2011 08:33:15(UTC)
parabuild
Rank: Advanced Member

Groups: Member
Joined: 10/07/2009(UTC)
Posts: 794
Man
Location: furness vale

Thanks: 3 times

It was 1865 when the question again arose of a railway to link Macclesfield and Whaley Bridge. A public meeting was held in Macclesfield Town Hall to present the proposals.  The Mayor presided and the engineer Mr Dennis outlined the plans. The distance by rail between Macclesfield and Buxton was then 34 miles and this would be halved by construction of the new line. A junction would be made at Whaley Bridge with the Buxton branch and only 8 miles of line would need to be constructed. The benefits of a direct route between Macclesfield and Sheffield were stated as were the opportunities for freight traffic between the Potteries and South Yorkshire.  The resolution passed by the meeting affirmed that the railway would be of great benefit to Macclesfield and it's neighbourhood.

parabuild  
#6 Posted : 03 July 2011 10:11:10(UTC)
parabuild
Rank: Advanced Member

Groups: Member
Joined: 10/07/2009(UTC)
Posts: 794
Man
Location: furness vale

Thanks: 3 times

A number of schemes sought to build a railway through the Hope Valley to Sheffield.  In November 1865 The Sheffield, Buxton and Liverpool Railway announced their proposals.  A  junction was to be constructed from the eastern end of New Mills Station (Newtown) on the Stockport, Disley and Whaley Bridge Railway and a railway constructed to terminate at 189 Glossop Road in Sheffield. A further branch was to be built from the northern end of the platform at Dove Holes to meet the first railway at Peak Forest, 800 yards north east of White Lee farmhouse.  A short line was also proposed within Sheffield branching from  the first railway at Lansdown Road and terminating at the Union Inn, Barker's Pool.  These two terminii were to the east of the City Centre, only 500 metres apart and some distance from any other railway. There was no apparent connection to any existing lines within Sheffield.  The route is not described. White Lee Farm is closer to Sparrowpit than to Peak Forest.

R. Stephenson-Smythe  
#7 Posted : 03 July 2011 10:31:25(UTC)
R. Stephenson-Smythe
Rank: Advanced Member

Groups: Member
Joined: 19/03/2009(UTC)
Posts: 1,494

Was thanked: 2 time(s) in 2 post(s)

 

Good Morning, David,
 
Just for people’s information Peak Forest Station was/is actually in Peak Dale.
 
As far as I know there was never a railway in Peak Forest.
 
This might explain the confusion with it’s position with regards to White Lee Farm.
 
Peak Forest Station was also known as Great Rocks and the row of cottages just opposite the Midland Hotel was once known as Great Rocks Row.
My Grandfather was born there
 
R. S-S
 
parabuild  
#8 Posted : 03 July 2011 16:13:23(UTC)
parabuild
Rank: Advanced Member

Groups: Member
Joined: 10/07/2009(UTC)
Posts: 794
Man
Location: furness vale

Thanks: 3 times

You are of course right R.S-S, there was never a railway at Peak Forest for this proposed railway was never constructed.  The reference is to a point 850 yards north West of Peak Forest which takes us to the vicinity of Sparrow Pit.  Peak Forest Station (at Peak Dale) closed in 1967, the old station building still stands and is currently used as offices.

R. Stephenson-Smythe  
#9 Posted : 07 July 2011 13:23:21(UTC)
R. Stephenson-Smythe
Rank: Advanced Member

Groups: Member
Joined: 19/03/2009(UTC)
Posts: 1,494

Was thanked: 2 time(s) in 2 post(s)

 

Hello, David,
 
There were bigger plans for Whaley Bridge with regards to railway extensions.
 
See article below.
 
R. S-S
 
High Peak News
 
7 June 1941
 
It is interesting to learn that but for the obstinate refusal of a local landowner to move with the times a hundred years ago modern Whaley Bridge might have been the Crewe of the North.
When the Manchester to London railway was first planned it was hoped to build it through the Goyt Valley, and had this scheme materialised Whaley Bridge would have become the main railway junction.    But Mr Grimshaw, of Errwood Hall, refused to have such a devilish invention as the railway running through his land, and so the plan had to be drastically revised.
In these days, when a main railway junction is regarded by the enemy as a legitimate objective, one feels inclined to bless the unprogesssiveness of that Victorian Grimshaw.
 
parabuild  
#10 Posted : 17 July 2011 07:32:08(UTC)
parabuild
Rank: Advanced Member

Groups: Member
Joined: 10/07/2009(UTC)
Posts: 794
Man
Location: furness vale

Thanks: 3 times

This next line would not have directly affected Whaley Bridge but it is an interesting proposal nonetheless

In November 1871 it was announced that a proposal was to be made to Parliament for a bill to enable construction of a narrow gauge railway between Hillsborough and Dove Holes.  The railway was to commence from a field just north of The Queen’s Ground Hotel  and to the west of Langsett Road.  This is about 2 miles from the city centre and on the opposite side of a river valley from the nearest railway some half mile away. Hillsborough was then on the outskirts of the city and the site was a farm field.  The Queen's Ground is still there and today trams pass the door. Possibly the site was chosen because of suitable access to Sheffield through the Rivelin Valley from the west.  It was not otherwise a convenient place to commence ones journey to Dove Holes.  The line was to continue westwards through Rivelin, Moscar and into the Lady Bower Gorge. It would turn southwards towards Bamford, Bradwell, Tideswell and Wormhill.  It was to reach Dove Holes some 700 yards south of the station.  There would be powers to continue the line towards Buxton, either alongside the existing railway or by converting it’s gauge to that of the line from Sheffield
The railway would be laid to a track gauge of 3 feet and would be 24 miles in length.  There would be two tunnels, not of great length and although the land was rough, by following contours, the railway would be built without any great engineering problems.
The proposed capital of the company would be £200,000 and powers would be sought to borrow up to £66,000. There would be five directors and by December these had already been named.  The Parliamentary bill would allow five years to complete the line. Passenger  fares were to be at the rate of 3d per mile. First class; 2d per mile, second class and 1d, third.

The route shown on these maps is only approximate.

parabuild attached the following image(s):
sheffeidl-Mapcomp.jpg
Narrow-Gauge-Mapcomp.jpg
Capturec.jpg
Users browsing this topic
Guest
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.